WHERE PROJECTS GO WRONG

Shield It Auckland 2 Scaled

No Protection Ownership

Protection is installed — but not actively managed.
This creates gaps in accountability, maintenance, reinstatement, and surface condition control.

Wrong Protection Systems

Many protection products are not designed for long-term exposure, sensitive substrates, or live construction environments.
Incorrect systems increase the risk of bonding, residue, coating failure, and surface damage.

No Documentation

Without documented condition records, installation tracking, and removal verification, disputes often emerge at handover when access is limited and rectification costs are highest.

Poor Programme Coordination

Façade protection is often treated as a last-minute site task instead of a managed construction process.
Without planning and sequencing, protection systems quickly fall behind live construction activity.

MOST FACADE ISSUES DON’T COME FROM A SINGLE FAILURE —

THEY COME FROM GAPS IN OWNERSHIP, SYSTEM SELECTION, AND CONTROL.

FACADE PROTECTION MANAGEMENT PROCESS

Structured. Documented. Managed from Frame to Finish

TRUSTED ON SITE

ShieldIt works with clients to reduce façade risk throughout construction.
The projects below demonstrate how protection systems are selected, applied, monitored, and managed within live construction environments.
Each project reflects:
  • Site-specific protection requirements
  • System selection aligned to substrate and exposure conditions
  • Coordination with construction sequencing and surrounding trades
  • Ongoing monitoring, reinstatement, and handover support

HEALTH & SAFETY

ShieldIt operates within a structured health and safety framework aligned with recognised industry standards, including a current SiteWise Gold grading.

Health and safety planning is undertaken prior to works commencing and continues throughout the project in accordance with agreed scopes, site conditions, and applicable requirements.

 

DISCUSS YOUR

PROJECT EARLY.

 

Early design input available for façade specification

“We’ve got your
project covered”.

 

Early engagement allows protection systems to be aligned with façade specification before site risk is introduced.